Optimization of Pile Length for Steel Frame Buildings on Narrow Lots for Housing Manufacturers | Geotech
Optimize the pile length of small sites economically and safely through neighboring data and on-site surveys.
In land utilization by residential manufacturers, building plans in urban small lots require harmony with the surrounding environment and adaptation to site conditions. In particular, ground surveys in limited spaces can pose challenges in accurately identifying the support layer due to difficulties in bringing in large machinery. Inadequate ground surveys can lead to excessive design or, conversely, a decrease in safety. Our ground surveys address these challenges by combining neighboring data analysis with on-site investigations, achieving economically and safely optimized pile lengths. 【Utilization Scenes】 - Building plans in urban small lots - Sites with narrow access roads or delivery routes - Proximity to adjacent buildings 【Effects of Implementation】 - Cost reduction by preventing excessive design - Reliable securing of the necessary support strength for structures - Balancing safety and economy
- 企業:ジオテック
- 価格:Other